Recent Requests near Cheney, WA
Other Carpentry Work
Justin N.
Cheney, WA
Floor joists are 48 OC with 1-1/8 plywood subfloor. My wife and I planned to put down porcelain tile wood looks floors and were concerned about the deflection in the floor. We are looking to see what would need to be done to the floor to prep it for porcelain tile.
Trim work
Kathy F.
Cheney, WA
Looking for someone to install Newell post and hand rail. We bought a Newell lock for the post and angled UT Railbolt for the hand rail.
Trim work
Nancy M.
Cheney, WA
Id like to remove carpet from stairs and replace with wood.
Other Carpentry Work
Ty S.
Spokane, WA
Add wood to family room to match kitchen and entry
Trim work
Gid A.
Veradale, WA
Were finishing a bonus room above our garage. We need to install 5 closet doors and 1 bathroom door and do door trim and bottom molding.